Our Proven Process

From initial design to move-in dayβ€”your journey to owning a custom barndominium, made simple with our proven 5-step process and transparent timeline.

Project Timeline Overview

Week 1-4
Pre-Construction
Design
Permits
Site Prep
Week 5-8
Foundation
Excavation
Concrete
Curing
Week 9-12
Structure
Steel Frame
Roof
Envelope
Week 13-18
Systems
Electrical
Plumbing
HVAC
Week 19-26
Finishes
Drywall
Flooring
Fixtures
Week 27-28
Completion
Inspection
Walkthrough
Move-in
Total Timeline: 4-8 Months

Timeline may vary based on size, complexity, weather, and permit processing

1

Design & Planning

Duration: 2-4 weeks

Transform your vision into detailed construction plans

What We Do:

  • βœ“Initial consultation and needs assessment
  • βœ“Custom floor plan design and revisions
  • βœ“3D visualization and virtual walkthrough
  • βœ“Material selection and finish specifications
  • βœ“Engineering and structural calculations
  • βœ“Permit application and approval process

Deliverables:

Custom floor plans3D renderingsMaterial specificationsEngineering drawingsPermit applications
2

Foundation & Steel Frame

Duration: 3-4 weeks

Establish the structural foundation of your barndominium

What We Do:

  • βœ“Site preparation and excavation
  • βœ“Concrete foundation pour and curing
  • βœ“Steel frame delivery and inspection
  • βœ“Structural steel erection
  • βœ“Roof system installation
  • βœ“Initial electrical and plumbing rough-ins

Deliverables:

Completed foundationErected steel frameInstalled roof systemWeather-tight structure
3

Systems & Enclosure

Duration: 4-6 weeks

Install essential systems and complete the building envelope

What We Do:

  • βœ“Electrical system installation and wiring
  • βœ“Plumbing system rough-in and testing
  • βœ“HVAC system installation and ductwork
  • βœ“Insulation installation (spray foam or batt)
  • βœ“Exterior siding and trim installation
  • βœ“Window and door installation

Deliverables:

Complete electrical systemFunctional plumbingHVAC systemInsulated envelopeExterior completion
4

Interior Finishing

Duration: 6-8 weeks

Transform your space with beautiful interior finishes

What We Do:

  • βœ“Drywall installation, texture, and painting
  • βœ“Flooring installation (concrete, LVP, tile)
  • βœ“Kitchen and bathroom fixture installation
  • βœ“Interior trim and millwork
  • βœ“Light fixture and electrical finish work
  • βœ“Final inspections and touch-ups

Deliverables:

Finished interior wallsInstalled flooringComplete kitchen & bathsAll fixtures & finishes
5

Final Walkthrough & Move-In

Duration: 1 week

Complete your project and prepare for move-in

What We Do:

  • βœ“Comprehensive quality inspection
  • βœ“Final walkthrough with homeowner
  • βœ“System demonstrations and training
  • βœ“Warranty documentation and handover
  • βœ“Key delivery and move-in coordination
  • βœ“30-day follow-up and support

Deliverables:

Quality certificationWarranty documentationSystem manualsKeys and access codes

Why Our Process Works

🎯

Proven System

Refined over 100+ projects to eliminate delays and ensure quality at every step.

πŸ“±

Transparent Communication

Weekly progress updates, photo documentation, and direct access to your project manager.

πŸ›‘οΈ

Quality Assurance

Multiple inspection points and 10-year structural warranty for your peace of mind.